CitraTest VU go-live load testing for Citrix, Microsoft RDS, AVD, and Windows 365 - run the new published app's real workflow next to the apps already on those session hosts, step concurrency up to the users you expect on day one and beyond, and set the go-live line from the glass.
Direct answer: A new published app usually reaches go-live after functional sign-off and a pilot group. Neither one shows what happens when every intended user opens it on the same morning - on session hosts that are already busy running the apps people use today. CitraTest VU® answers that before go-live: script the new app's real workflow, run it alongside scripts for the apps already on those hosts, step concurrency up to the expected day-one users and past them, and watch WaitForImage-confirmed StartTimer/StopTimer results, tails, and fail rate at each step. Tevron's product page puts it plainly: rapidly test new applications without any code changes or production impact.
Go-live day has a shape. Training ends, the old process is switched off, and everyone who was told "use the new app from Monday" does exactly that. The app is new; the session hosts are not. They already carry email, the line-of-business client, the browser, and whatever else is published to the same users.
That is the go-live problem: "the app works" was proven by testers and a pilot; "the app works for everyone at once, next to everything else" is a load question.
By Jay Labadini, Tevron
Why functional sign-off and a pilot are not enough
Functional testing proves the screens are right. A pilot proves a small group can work. Neither puts the full day-one population on the farm at once, and neither measures the new app while existing workloads compete for the same hosts. A front-door check proves a session can start; it does not prove the new app's first screen paints in time when the host is full. Related: The Control Plane Is Not the Farm.
Test the new app the way it will live: next to the others
Each CitraTest VU script executes in its own desktop and opens its own client connection to the server under test, just as a group of real users would. That makes a mixed run straightforward: one set of virtual users works the new published app, others work the apps already published to the same hosts, and every one of them is timed on the glass.
| Build into the run | Why it matters for go-live |
| The new app's real workflow | Validate multi-step business days - logon, published app, open record, save - not just an app launch. |
| The existing workload | Scripts for the apps already on those hosts, so the new app is measured under the contention it will actually meet. |
| Concurrency steps | You set ramp and concurrency. Step from a single-user baseline to half of day-one users, to the expected number, and past it for headroom - holding each step long enough to measure. |
| Storm vs sustain | Keep the start-of-day login storm separate from the sustained run. See Logon Storm vs Density. |
| Server metrics | CitraTest VU records server performance under load while the run is in progress, so host behavior lines up with each step. |

Illustrative method diagram - not customer results. Step labels are examples; set the steps to your own expected users.
One measurement contract: see, wait, act, measure
- Scripts encode the workflow on a Windows desktop with the point-and-click scripting wizard.
- Playback sees the UI with bitmap images (and OCR when text is dynamic).
- Playback acts with real mouse and keyboard.
- WaitForImage synchronizes and verifies expected screen state before the next step.
- StartTimer / StopTimer capture on-screen response: StartTimer immediately after the initiating action; StopTimer immediately after WaitForImage confirms completion.
Baseline a single user on the glass first, so every later step has a reference. Prefer small, unique, static bitmaps for sync cues; reserve OCR for values unknown ahead of time - OCR is not a wait/sync.

Illustrative method diagram - not customer results.
Set the go-live line from the glass
- Watch tails and fail rate, not only averages - p95/p99 times for the new app's key screens are what a change board can defend.
- Watch the existing apps too - if the new app holds but an app users already rely on slows down at the same step, that is a go-live problem as well.
- Find the step where the glass stops holding - stop at a concurrent-user line the hosts and profiles can keep, and compare it with the users you expect on day one.
- Decide - go live, add or resize hosts and rerun the same steps, or stage the rollout so day one stays under the line.
After go-live: keep watching the same screens
The scripts that proved the new app under load describe exactly what users need to see. After go-live, CitraTest APM can keep running the same kind of glass-level transactions in production, so the first slow morning is caught on screen rather than by the service desk. VU proves capacity and user experience before and during change; APM watches continuously afterward.
How this sits next to related posts (brief)
Closing: go live at a number you measured
Day-One Concurrency is not a new product mode. It is CitraTest VU pointed at the morning a new published app meets all of its users at once: script the real workflow, run it next to the apps already on those hosts, step concurrency to day-one users and past them, confirm every screen with WaitForImage, time it with StartTimer/StopTimer, and set the go-live line where the glass stops holding. Functional sign-off and a pilot still matter. They are not a concurrency test.
FAQ
How do you load test a new published app before go-live?
Script the app's real multi-step workflow in CitraTest VU, run it alongside scripts for the apps already on the same session hosts, and step concurrency from a single-user baseline up to the users expected on day one and beyond. WaitForImage confirms each screen and StartTimer/StopTimer time it at every step.
Why include the existing apps in a go-live load test?
The new app will share session hosts with apps users already rely on. Testing it alone measures an empty farm. A mixed run shows how the new app performs under real contention - and whether existing apps slow down when it arrives.
How do you decide how many users the new app can support?
Watch p95/p99 on-screen times and fail rate at each concurrency step, alongside server performance recorded during the run. The go-live line is the step where the glass stops holding; compare it with expected day-one users before you switch the old process off.
Does go-live load testing need code changes or agents on production servers?
No. CitraTest VU tests new applications without code changes or production impact, drives the real client from outside like real users, and does not install agents on production servers.
What happens after go-live?
CitraTest APM can keep running glass-level transactions for the new app in production, so slowdowns are seen on screen before users report them. VU covers load and capacity before and during change; APM covers ongoing monitoring.
Contact Tevron
Tevron LLC
402 Amherst Street, Nashua, NH 03060
Phone: 866.788.3650
Email: sales@tevron.com
Web: www.tevron.com
Product: CitraTest VU | CitraTest APM | CitraTest
Charts labeled illustrative are method diagrams, not customer benchmarks. Citrix, Citrix Virtual Apps and Desktops, Citrix DaaS, Microsoft, Remote Desktop Services, Azure Virtual Desktop, Windows 365, and related marks are trademarks of their respective owners. Tevron is not affiliated with Citrix or Microsoft. Names are used for identification only. CitraTest®, CitraTest VU®, and CitraTest APM® are Tevron products.